|
Let MSA support your Design / Build team Across the U.S.
MSA Military Projects |
Active: |
| |
Project: Construct new Fort Knox High School and demo existing
|
Proposal Participation: |
| |
Armed Forces Reserve Center :
-
Columbus , Ohio- $31 million
-
Niagara Falls , New York- $31 million
|
| |
| |
Human Resources Command Center of Excellence
- Fort Knox , Kentucky $183 million
|
| |
| |
Special Operations Headquarters:
- Fort Campbell , Kentucky $30 million
|
Survey Jobs: |
| |
Project:
- Brigade/Battalion Headquarters Annex
- Phase II IBCT Brigade Dining Facility
- Location: Fort Knox , Kentucky
- Prime Contractor: B. L. Harbert International
- Client: Louisville District Corps of Engineers
|
| |
| |
Project:
Fort Knox High School
-
Location: Fort Knox , Kentucky
-
Prime Contractor: Barton Malow
-
Client: Louisville District Corps of Engineers
|
| |
| |
Project:
Jacobs Engineering |
MSA Staff Experience on Military Projects
Qualifications
- USACE Contractor Quality Control Certified
- SECRET level clearance
Fort Benning
- Design of Brinson Small Arms Range
- Design of Sniper School Shooting Tower
- Design of Cactus Range (tanks)
- Design of Infantry Training Trenchline
- Design of Clear Creek Road Repair
- Design of Martin Army Hospital parking lot and pedestrian walking trail
- Design of Ranger School Parking Lot
- Design of Pomeroy Field infantry graduation parking lot
- Design of New Post Entry Control Points
- Design/Feasibility analysis of Fort Benning Anti-Terrorism Force Protection levels
- Provided Quality Control for numerous USACE barracks, dining halls, and airfield reconstruction on post
Fort Knox , Kentucky
- Served in Fort Knox Area office as assistant project engineer for construction of barracks, dining facilities, MOUT project enhancements and SECRET level projects
Fort Pickett , Virginia
- Constructed Phase 1 of the FBI Road Training Course Hunter Army Airfield, Georgia
- Designed post pedestrian running trail across airfield drainage structures for Fort Stewart Department of Public Works
Baghdad , Iraq
Designed and Constructed:
- Mortuary
- Dental Clinic
- Troop Medical Clinic
- Anti-Terrorism /Force Protection for Camp Victory and Camp Liberty
- Drainage design for 9 US Base Camps
- Designed 3 rd Iraqi Army Division Headquarters
- Designed the reconstruction of Saddam's drainage system and lake canal system on Camp Victory
- Designed and Constructed: 12 Company Headquarters, 6 Battalion Headquarters and 2 Brigade Headquarters
- Designed and Constructed new Finance Headquarters
- New Entry Control Complexes including vehicle x-ray machines, bomb detection facilities, and Force Protection
- Designed blast proof polling stations for first Iraqi Elections
- Master planned 12 US Base Camps and 6 Iraqi Army Base Camps
Talil Air Base , Iraq
- Designed and Constructed 1 mile of new roadway entrance to Camp Cedar 2
- Constructed new US base camp for 10,000 US soldiers including trailer transfer point, motorpools, etc
MSA - Lifetime members of S.A.M.E. -Society of American Military Engineers
Louisville KY Chapter Members

|
 |
 |